Well Decommissioning
Well Decommissioning
Well Decommissioning
Well Decommissioning
Well Decommissioning
Well Decommissioning
Well Decommissioning
Well Decommissioning   
Nutrient Management
OnSite Wastewater System
OnSite Wastewater System
OnSite Wastewater System 
OnSite Wastewater System
OnSite Wastewater System 
OnSite Wastewater System
OnSite Wastewater System   
OnSite Wastewater System  
OnSite Wastewater System  
OnSite Wastewater System   
OnSite Wastewater System   
OnSite Wastewater System 


These are the practices we offer for Non Point Source Pollution Cost Share Program
Aggregate Fill 
Chlorine
Complete Practice - Capping   
Complete Practice - Casing 10" - 24"
Grout - Bentonite      
Labor 
Pump, Pipeline Removal 
Subsoil Fill   
Soil Test - Profile Nitrogen
Concrete Tank - 1250 Gallon
Concrete Tank - 1500 Gallon
Conventional Absorption Field - 24"
Conventional Absorption Field - 36"
Earthwork - Cubic Yard 
Infiltration Chamber - 18" - 24"
Infiltration Chamber - 36"  
Lift Station with Pump
Pipe, Sch40 < 5 ft. Trench Depth
Pipe, Sch40 > 5 ft. Trench Depth 
Plastic Tank - 1250 Gallon
Plastic Tank - 1500 Gallon


Cubic Yard     
Gallon
Each  
Linear Foot 
Bag   
Hour  
Each  
Cubic Yard  
Test   
Each  
Each 
Linear Foot  
Linear Foot  
Cubic Yard  
Linear Foot  
Linear Foot  
Each
Linear Foot
Linear Foot
Each 
Each 
$10.00  70.00 %
$1.25   70.00 %
$550.00 70.00 %
$10.00  70.00 %
$6.00   70.00 %
$65.00  70.00 %
$75.00  70.00 %
$6.00   70.00 %
$7.50   100.00 %
$880.00 70.00 %
$990.00 70.00 %
$8.00   70.00 %
$8.50   70.00 %
$1.78   70.00 %
$11.00  70.00 %
$13.00  70.00 %
$800.00 70.00 %
$6.50   70.00 %
$6.50   70.00 %
$825.00 70.00 %
$935.00 70.00 %
These are the practices we offer for Water Resources Cost Share Program
Contour Buffer Strips
Critical Area Planting
Diversion
Field Border
Filter Strip
Grade Stabilization Structure
Grade Stabilization Structure
Grassed Waterway Restoration
Grassed Waterway Restoration
Grassed Waterway or Outlet
Grassed Waterway or Outlet
Mulching
Pasture and Hayland Planting
Range Planting
Subsurface Drain
Subsurface Drain
Terrace
Terrace
Terrace Parallel
Terrace
Terrace Restoration
Terrace Restoration
Terrace Restoration
Terrace Restoration
Tree/Shrub Establishment
Tree/Shrub Establishment
Tree/Shrub Establishment
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet
Underground Outlet Restoration
Underground Outlet Restoration
Underground Outlet Restoration
Underground Outlet Restoration
Underground Outlet Restoration )
Underground Outlet Restoration
Underground Outlet Restoration
Underground Outlet Restoration
Underground Outlet Restoration
Underground Outlet Restoration
Underground Outlet Restoration
Underground Outlet Restoration
Water and Sediment Control Basin
Windbreak/Shelterbelt Establishment
Windbreak/Shelterbelt Establishment
Windbreak/Shelterbelt Establishment
Critical Area Planting
Fencing
Fencing
Fencing
Pasture and Hayland Planting
Pasture and Hayland Planting Reseeding
Pipeline
Pipeline
Pipeline
Pipeline
Pond
Pond
Pond
Pond
Pond
Pond
Pond
Pond Restoration
Pond Restoration 
Pond Restoration
Pond Restoration
Pond Restoration
Pond Restoration
Pond Restoration
Range Planting
Range Planting Reseeding
Spring Development
Water Well
Watering Facility
Watering Facility
Critical Area Planting
Critical Area Planting Reseeding
Fencing
Fencing
Fencing
Filter Strip
Filter Strip Reseeding
Mulching
Pipeline
Pipeline
Pipeline
Pipeline 
Pond
Pond
Pond 
Pond
Pond
Pond
Pond
Riparian Forest Buffer
Riparian Forest Buffer
Riparian Forest Buffer
Spring Development
Spring Development
Water Well
Watering Facility
Watering Facility
Windbreak/Shelterbelt Establishment
Windbreak/Shelterbelt Establishment
Windbreak/Shelterbelt Establishment
Windbreak/Shelterbelt Establishment
Windbreak/Shelterbelt Establishment
Wetland Creation
Wetland Creation
Wetland Creation
Wetland Creation
Wetland Creation
Wetland Creation
Wetland Creation
Wetland Creation
Wetland Creation
Wetland Enhancement
Wetland Enhancement
Wetland Enhancement
Wetland Enhancement
Wetland Enhancement 
Wetland Enhancement
Wetland Enhancement
Wetland Enhancement
Wetland Restoration
Wetland Restoration
Wetland Restoration
Wetland Restoration
Wetland Restoration
Wetland Restoration
Wetland Restoration

Complete Practice - Seed Mix # 1
Complete Practice - Seed Mix # 1
Earthwork
Complete Practice - Seed Mix # 1
Complete Practice - Seed Mix # 1
Concrete - Cubic Yard
Earthwork
Shaping
Topsoiling - Acre
Shaping
Topsoiling - Acre
Fabric Weed/Moisture Barrier - Roll
Complete Practice - Seed Mix # 1
Complete Practice - Seed Mix # 1
4" Dia P-Pipe Ungrd Outlet Main Conduit Pe
6" Dia P-Pipe Ungrd Outlet Main Conduit Pe
Gradient
Grass Back - Linear Foot        Linear Foot     $2.50   70.00 %
Parallel 
Tile
Gradient, Restoration
Grass Back, Restoration - Linear Foot
Parallel, Restoration
Tile, Restoration
Shrub
Tree - Bareroot
Tree - Containerized
10" Dia PE Underground Outlet Pipe 2/ - Combined Components
10" Dia PVC Underground Outlet Pipe 2/ - Combined Components
12" Dia PE Underground Outlet Pipe 2/ - Combined Components 
12" Dia PVC Underground Outlet Pipe 2/ - Combined Components
15" Dia PE Underground Outlet Pipe 2/ - Combined Components
15" Dia PVC Underground Outlet Pipe 2/ - Combined Components
4" Dia PE Underground Outlet Pipe 2/ - Combined Components
4" Dia PVC Underground Outlet Pipe 2/ - Combined Components
6" Dia PE Underground Outlet Pipe 2/ - Combined Components
6" Dia PVC Underground Outlet Pipe 2/ - Combined Components
8" Dia PE Underground Outlet Pipe 2/ - Combined Components
8" Dia PVC Underground Outlet Pipe 2/ - Combined Components
10" Dia PE Underground Outlet Pipe 2/ - Combined Components
10" Dia PVC Underground Outlet Pipe 2/ - Combined Components
12" Dia PE Underground Outlet Pipe 2/ - Combined Components
12" Dia PVC Underground Outlet Pipe 2/ - Combined Components
15" Dia PE Underground Outlet Pipe 2/ - Combined Components 
15" Dia PVC Underground Outlet Pipe 2/ - Combined Components
4" Dia PE Underground Outlet Pipe 2/ - Combined Components 
4" Dia PVC Underground Outlet Pipe 2/ - Combined Components
6" Dia PE Underground Outlet Pipe 2/ - Combined Components
6" Dia PVC Underground Outlet Pipe 2/ - Combined Components
8" Dia PE Underground Outlet Pipe 2/ - Combined Components
8" Dia PVC Underground Outlet Pipe 2/ - Combined Components
Earthwork
Shrub  
Tree - Bareroot
Tree - Containerized
Complete Practice - Seed Mix # 1
Pond Fencing
Wire - 4 Strand
Wire - 5 Strand
Complete Practice - Seed Mix # 1
Complete Practice - Seed Mix # 1
1 1/2" Dia Siphon Supply Line Over Dam 10/ - Combined Components
1-1/2" Dia Water Supply Line Under Dam 9/ - Combined Components
2" Dia Siphon Supply Line Over Dam 10/ - Combined Components
2" Dia Water Supply Line Under Dam 9/ - Combined Components
10" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
12" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
15" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
18" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
8" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components 
Concrete - Cubic Yard
Earthwork - Cubic Yard
10" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
12" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
15" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
18" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
8" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
8" Dia Drop Inlet Spillway - CMP Pipe 6/ - Combined Components
Earthwork - Cubic Yard
Complete Practice - Seed Mix # 1
Complete Practice - Seed Mix # 1
Collection and Delivery
Casing - Other
Tank # 1 - Each
Tank # 2 - Each
Complete Practice - Seed Mix # 1
Complete Practice - Seed Mix # 1
Pond Fencing
Wire - 4 Strand
Wire - 5 Strand
Complete Practice - Seed Mix # 1 
Complete Practice - Seed Mix # 1
Fabric Weed/Moisture Barrier - Roll
1 1/2" Dia Livestock Supply Pipeline 11/ - Combined Components
1-1/2" Dia Water Supply Line Under Dam 9/ - Combined Components
2" Dia Siphon Supply Line Over Dam 10/ - Combined Components
2" Dia Water Supply Line Under Dam 9/ - Combined Components
10" Dia Canopy Inlet Spillway - Plastic Pipe 4/ - Combined Components
12" Dia Canopy Inlet Spillway - Plastic Pipe 4/ - Combined Components
15" Dia Canopy Inlet Spillway - Plastic Pipe 4/ - Combined Components
18" Dia Canopy Inlet Spillway - CMP Pipe 5/ - Combined Components
8" Dia Canopy Inlet Spillway - Plastic Pipe 4/ - Combined Components
Concrete - Cubic Yard
Earthwork - Cubic Yard
Shrub
Tree - Bareroot
Tree - Containerized
Collection and Delivery
Collection and Delivery - Other
Casing - Other
Tank # 1 - Each
Tank # 2 - Each
Concrete - Cubic Yard
Earthwork
Shrub
Tree - Bareroot
Tree - Containerized
10" Dia Inlet Water Level Control Structure 7/ - Combined Components
10" Dia PVC Underground Outlet Pipe 2/ - Combined Components
12" Dia Inlet Water Level Control Structure 7/ - Combined Components
12" Dia PVC Underground Outlet Pipe 2/ - Combined Components
8" Dia Inlet Water Level Control Structure 7/ - Combined Components
8" Dia PVC Underground Outlet Pipe 2/ - Combined Components
Drop Log Structure
Earthwork
Hydrophytic Vegetation
10" Dia Inlet Water Level Control Structure 7/ - Combined Components
10" Dia PVC Underground Outlet Pipe 2/ - Combined Components
12" Dia Inlet Water Level Control Structure 7/ - Combined Components
12" Dia PVC Underground Outlet Pipe 2/ - Combined Components
8" Dia Inlet Water Level Control Structure 7/ - Combined Components
8" Dia PVC Underground Outlet Pipe 2/ - Combined Components
Earthwork
Hydrophytic Vegetation
10" Dia Inlet Water Level Control Structure 7/ - Combined Components
10" Dia PVC Underground Outlet Pipe 2/ - Combined Components
12" Dia Inlet Water Level Control Structure 7/ - Combined Components
12" Dia PVC Underground Outlet Pipe 2/ - Combined Components
8" Dia Inlet Water Level Control Structure 7/ - Combined Components
8" Dia PVC Underground Outlet Pipe 2/ - Combined Components
Earthwork

Acre    $215.00 70.00 %
Acre    $215.00 70.00 %
Cubic Yard      $2.25   70.00 %
Acre    $215.00 70.00 %
Acre    $215.00 70.00 %
Cubic Yard      $350.00 70.00 %
Cubic Yard      $2.25   70.00 %
Acre    $1,925.00       70.00 %
Acre    $610.00 70.00 %
Acre    $1,925.00       70.00 %
Acre    $610.00 70.00 %
Linear Foot     $7.85   70.00 %
Acre    $215.00 70.00 %
Acre    $215.00 70.00 %
Linear Foot     $3.95   70.00 %
Linear Foot     $4.63   70.00 %
Linear Foot     $1.25   70.00 %
Linear Foot     $2.50   70.00 %
Linear Foot     $1.55   70.00 %
Linear Foot     $1.90   70.00 %
Linear Foot     $1.90   70.00 %
Linear Foot     $2.50   70.00 %
Linear Foot     $1.55   70.00 %
Linear Foot     $2.50   70.00 %
Shrub   $2.25   70.00 %
Tree    $2.16   70.00 %
Tree    $2.46   70.00 %
Linear Foot     $7.85   70.00 %
Linear Foot     $14.05  70.00 %
Linear Foot     $9.05   70.00 %
Linear Foot     $17.81  70.00 %
Linear Foot     $12.30  70.00 %
Linear Foot     $19.25  70.00 %
Linear Foot     $3.91   70.00 %
Linear Foot     $5.64   70.00 %
Linear Foot     $4.63   70.00 %
Linear Foot     $7.44   70.00 %
Linear Foot     $5.63   70.00 %
Linear Foot     $10.15  70.00 %
Linear Foot     $7.85   70.00 %
Linear Foot     $14.05  70.00 %
Linear Foot     $9.05   70.00 %
Linear Foot     $17.81  70.00 %
Linear Foot     $12.30  70.00 %
Linear Foot     $19.25  70.00 %
Linear Foot     $5.00   70.00 %
Linear Foot     $5.64   70.00 %
Linear Foot     $4.63   70.00 %
Linear Foot     $7.44   70.0
Linear Foot     $5.35   70.00 %
Linear Foot     $10.15  70.00 %
Cubic Yard      $2.25   70.00 %
Shrub   $2.25   70.00 %
Tree    $2.16   70.00 %
Tree    $2.36   70.00 %
Acre    $215.00 70.00 %
Linear Foot     $4.00   70.00 %
Linear Foot     $2.85   70.00 %
Linear Foot     $3.25   70.00 %
Acre    $215.00 70.00 %
Acre    $215.00 70.00 %
Each    $575.00 70.00 %
Each    $800.00 70.00 %
Each    $600.00 70.00 %
Linear Foot     $28.00  70.00 %
Linear Foot     $29.00  70.00 %
Linear Foot     $33.00  70.00 %
Linear Foot     $38.00  70.00 %
Linear Foot     $22.00  70.00 %
Cubic Yard      $380.00 70.00 %
Cubic Yard      $2.25   70.00 %
Linear Foot     $26.00  70.00 %
Linear Foot     $29.00  70.00 %
Linear Foot     $33.00  70.00 %
Linear Foot     $38.00  70.00 %
Linear Foot     $22.00  70.00 %
Linear Foot     $25.00  70.00 %
Cubic Yard      $2.25   70.00 %
Acre    $215.00 70.00 %
Acre    $215.00 70.00 %
Each    $2,505.00       70.00 %
Linear Foot     $9.00   70.00 %
Each    $510.00 70.00 %
Each    $550.00 70.00 %
Acre    $215.00 70.00 %
Acre    $215.00 70.00 %
Linear Foot     $4.00   70.00 %
Linear Foot     $2.85   70.00 %
Linear Foot     $3.25   70.00 %
Acre    $215.00 70.00 %
Acre    $215.00 70.00 %
Linear Foot     $0.99   70.00 %
Linear Foot     $2.92   70.00 %
Each    $550.00 70.00 %
Each    $800.00 70.00 %
Each    $650.00 70.00 %
Each    $600.00 70.00 %
Linear Foot     $26.00  70.00 %
Linear Foot     $31.00  70.00 %
Linear Foot     $33.00  70.00 %
Linear Foot     $38.00  70.00 %
Linear Foot     $22.00  70.00 %
Cubic Yard      $350.00 70.00 %
Cubic Yard      $2.25   70.00 %
Shrub   $2.25   70.00 %
Tree    $2.16   70.00 %
Tree    $2.25   70.00 %
Each    $2,750.00       70.00 %
Each    $550.00 70.00 %
Linear Foot     $9.00   70.00 %
Each    $510.00 70.00 %
Each    $550.00 70.00 %
Cubic Yard      $300.00 70.00 %
Cubic Yard      $2.25   70.00 %
Shrub   $2.00   70.00 %
Tree    $2.16   70.00 %
Tree    $2.25   70.00 %
Each    $1,400.00       70.00 %
Linear Foot     $11.00  70.00 %
Each    $1,800.00       70.00 %
Linear Foot     $13.00  70.00 %
Each    $1,200.00       70.00 %
Linear Foot     $7.00   70.00 %
Each    $800.00 70.00 %
Cubic Yard      $2.25   70.00 %
Each    $2.16   70.00 %
Each    $1,400.00       70.00 %
Linear Foot     $11.00  70.00 %
Each    $1,800.00       70.00 %
Linear Foot     $13.00  70.00 %
Each    $1,200.00       70.00 %
Linear Foot     $7.00   70.00 %
Cubic Yard      $2.25   70.00 %
Each    $2.16   70.00 %
Each    $1,400.00       70.00 %
Linear Foot     $11.00  70.00 %
Each    $1,800.00       70.00 %
Linear Foot     $13.00  70.00 %
Each    $1,200.00       70.00 %
Linear Foot     $7.00   70.00 %
Cubic Yard      $2.25   70.00 %